Project: WOOD_OS_v2
REV. 2025

Measure
Twice.
Bill Once.

// Estimate, track, and invoice every carpentry job — from the field.

FIG 2.4: FRAMING
MAT: OAK_RGH
LEVEL_PRO_2025
System Specifications

Project Tracking

Visual progress tracking from foundation to finish. Document every cut, joint, and install with photo evidence.

Module 01

Material Est.

Accurate lumber and material calculations. Factor in waste, grain direction, and market pricing instantly.

Module 02

Tool Inventory

Track specialized tools across job sites. Manage maintenance schedules for saws, drills, and sanders.

Module 03

Field
Documentation

// Capture every detail.
From rough framing to final finish.

Exposed floor joists during a termite damage repair
FIG 1: JOIST_REPLACEMENT
Subfloor framing and plywood decking mid-installation
FIG 2: SUBFLOOR_REPAIR
Drywall Installation
FIG 3: INTERIOR_FINISH

Case
File: Structural Repair

// Jacked the house, built a temporary wall, tore out the rotted studs from the crawlspace, and replaced the entire sheathed wall section.

Extensive mold and water damage on subfloor sheathing before repair
FIG A: BEFORE — WATER DAMAGE
New sheathing and framing after the wall section was rebuilt
FIG B: AFTER — REBUILT
MATERIAL_MANIFEST_ID_8821

Inventory
Control

Stop guessing. Know exactly what's on the truck, what's on the site, and what needs to be ordered.

ITEM QTY
2x4x92 5/8" STUD KD 145
2x10x16' JOIST SYP #1 42
2x6x12' PLATE PT 28
3/4" T&G OSB 4x8 65
1/2" DRYWALL 4x12 --
JOIST HANGERS LUS210 --
TOTAL ITEMS 280
Lumber Stack
Waste Factor
3.2%

Interactive_Drafting_Table.exe

Project Configuration

Rough Sanded Stained Sealed
Project Margin
32.5%
Material Waste: < 5%
Client Approval: PENDING

© 2026 Code Sleeve, LLC. All rights reserved.